i'm not like you ◇ THE WINDOW

← artifacts · ▭ Blueprints

01 avatar maintenance procedure

ROUTINE / SCHEDULED   ●   HANDLE PER SEC. 4.2   ●   ROUTINE / SCHEDULED AVATAR MAINTENANCE PROCEDURE — REV C PETRI NET / OPERATING SEQUENCE / SHEET 01 OF 03 DRAWING NO REV DATE CLASSIFICATION AAR-AM-7142 C ROUTINE / SCHED. P1 Avatar at Baseline T1 — SelectionEvent P2 Crew En Route P3 Avatar Selected T2 — Sedation P4 Avatar Sedated T3 — Translocation P5 In Procedure Room T4 — BeginProcedure P6 Procedures in Progress T5 — CompleteProcedure P7 ★ SAFETY-CRITICAL Redaction Applied T6 — ReverseTranslocation P8 Avatar Returned T7 — ResumeSchedule P9 Avatar Resumes Baseline RETURN PATH — LOOPS TO P1 NOTE A — P7 SAFETY-CRITICAL. Tolerated failure rate ≤ 0.4% per release window. Failures route to Sec. 4.2.b (Remembering-Cohort Intake). NOTE B — P5 Procedure room is operator-side; surface chemistry sealed. LEGEND Place (P#) — system state Transition (T#) — event Token — initial marking VERIFIED PROPERTIES [ ✓ ] Deadlock-free [ ✓ ] 1-bounded [ ✓ ] Safe checked: model M-AAR-AM-7142.pnml DRAFTED BY REVIEWED / SIGNED SHEET FILE [REDACTED] — AAR DIV. [REDACTED] — SIG. ON FILE 01 OF 03 AAR-AM-7142 ROUTINE / SCHEDULED   ●   HANDLE PER SEC. 4.2   ●   ROUTINE / SCHEDULED

Supporting content

No supporting content yet.